The cruise starts with the lock through one of the locks. Then we sail to the sea lock, which is under construction, where we sail past the work. Then along the Noordersluis and a bit into the drainage canal, where the salt/freshwater barrier will be constructed.
Due to the Coronavirus, a maximum of 40 people per canal can go on for the time being.
The boat departs and arrives at the berth at the “Dankzij Terminal” at Sluisplein No. 78 called “Kop van de haven“. The mooring is near the fishing monument of the man with the lantern. View the map on the contact page.